Connecticut
On the horizon: A new Connecticut River crossing for walkers and cyclists
Cyclists and pedestrians will have a new route across the Connecticut River starting next month, when the opening of the long-awaited multi-purpose trail along the Putnam Bridge creates a scenic connection between Wethersfield and Glastonbury.
Contractors have completed the roughly 1.4-mile paved trail, and the state transportation department expects to open it in mid-May.
“People are going to enjoy it. There probably won’t be a deluge of people going to either town, but I think it will surprise some people how often it gets used,” said Kevin T. Sullivan, co-founder of Bike Walk Wethersfield, a prominent advocacy group for cyclists and pedestrians.
The project took two years and has spurred planners in both towns to look for ways to link established cycling routes to what is being called the Putnam Bridge Trail.
Walkers and cyclists will be able to go from Great Meadow Road in Wethersfield to Naubuc Avenue in Glastonbury.
The Putnam carries about 55,000 cars and trucks each day, but until now non-motorized traffic had to take an 8-mile trip to the Charter Oak Bridge in Hartford to cross the river. Alternatives to the south required an even greater detour: 26 miles to the Arrigoni Bridge in Middletown and back, or else 11 miles to the seasonal Glastonbury-Rocky Hill ferry.

The plan is for trail connections on the east side of the river to reach the Goodwin College trails in East Hartford, while on the west side Wethersfield planners are putting together a temporary route to Main Street in Old Wethersfield.
Eventually the town plans a permanent, dedicated trail for that, and Wethersfield officials are meeting in May to give a public update about progress.
Sullivan said recreational riders can do 10- or 15-mile rides using connector routes from the bridge trail, but said he anticipates that most of the use will be from people traveling locally.
“I’ve heard from quite a few people regionally who are excited about it, but I don’t know if they’re planning to ride it or they’re just happy to have more trail connections,” he said Thursday. “My personal bet is that more people will be using it for everyday transportation.”
Wethersfield resident Joseph Sica, who was out riding near the oil tanks along the river recently, said he’s looking forward to the bridge route opening. But he questioned whether there will be enough routes to connect with after getting to the other side.
“Sometimes I do 10 miles a day. I like going over a bridge, so I’ll definitely go over to the other side. But there really aren’t many places to go over there, so maybe I’ll just turn around and come back,” Sica said.

With the trail work done, the state department of transportation is now turning its attention to a makeover for the bridge itself.
In a presentation earlier this month, DOT planners said they anticipate launching a major rehabilitation project in the spring 2026 that will run through the end of 2027.
The bridge is 64 years old and is suffering corrosion that needs to be addressed, the DOT said. The plan is to replace any deficient structural elements and make repairs to extend its life by 20 to 25 years.
The Putnam isn’t at risk right now, but overall gets just a five rating — “fair” — on a scale of one (imminent failure) to nine (excellent), according to Tracey Brais, a DOT project manager, and Ron Sacchi, project manager for the GM2 consulting firm.

“There appears to be some seepage through the deck that’s starting to produce corrosion,” Sacchi said.
Workers will replace expansion joints, patch the deck, strengthen steel support elements, strip the asphalt off the bridge deck and repave the roadway, the DOT said.
The four-lane bridge will be repaired in stages, with one lane in each direction kept open and most lane closures limited to nights and weekends, the DOT said.
“When we’re doing top of the deck repairs, we’ll probably have to close one lane in each direction,” Sacchi said. “If more lane closures are required it might involve a weekend closure that would involve a detour over the Charter Oak Bridge. At this point, we are not expecting any long-term closures or long-term detours.”
Federal grants will pay 80% of the cost, with Connecticut covering the other 20%. Brais said planners are still evaluating the cost, which could vary from a base of $31.4 million to slightly more than double that if the entire bridge undergoes repainting.
The cost of removing the bridge’s existing lead paint makes up most of the difference, largely because contractors would need to use a containment system to prevent contamination from falling paint chips.
Connecticut
Connecticut Launches New Era for Community Hospital Care – UConn Today
Marked by a ceremonial ribbon cutting and attended by Governor Ned Lamont, state legislators, Waterbury officials, and community leaders, UConn Health celebrated the acquisition of Waterbury Hospital which as of today is now the UConn Health Waterbury Hospital.
“This is a defining moment for healthcare in Connecticut,” said Dr. Andrew Agwunobi, CEO of UConn Health Community Network. “We now have the opportunity to take the award -winning academic quality and service of UConn Health and share it with the wonderful employees, doctors and community of Waterbury.”
Connecticut Governor Ned Lamont described the initiative as a forward-looking investment in the future of healthcare access across Connecticut.
“Connecticut is leading with innovation,” said Connecticut Governor Lamont. “The UConn Health Community Network reflects a proactive approach to strengthening community-based care by connecting it directly to the capabilities of our state’s public academic medical center. What begins in Waterbury today, represents a new model designed to expand opportunity, access, and excellence for communities statewide.”
In addition to UConn Health Waterbury Hospital, the Network includes UConn Health Community Network Medical Group and UConn Health Waterbury Health at Home. The model preserves each member’s local identity and will grow thoughtfully over time to improve quality, expand access, and reduce the total cost of care.
“This reflects a bold step forward in how we think about healthcare in Connecticut,” said John Driscoll, Chair of the UConn Health Board of Directors. “Today we celebrate the beginning of a new approach to community-based care. We move forward with clarity of purpose and shared commitment to serve our communities better together.”
Comptroller Sean Scanlon highlighted the significance of the model for the long-term evolution of healthcare delivery in Connecticut.
“This partnership represents thoughtful leadership at a pivotal time for healthcare,” said Connecticut Comptroller Sean Scanlon. “By aligning community hospitals with academic medicine, Connecticut is building a modern framework that positions our healthcare system to meet the needs of patients today and into the future.”
“Hosting this celebration on our campus is deeply meaningful for our staff, physicians and the families we serve,” said Deborah Weymouth, President of UConn Health Waterbury Hospital. “Waterbury’s legacy of care continues, and we are tremendously proud to have a strong partner who is deeply committed to our community and help lead this next chapter for healthcare.”
Welcome UConn Health Waterbury Hospital!
Connecticut
Multiple cars involved in crash on I-84 in Hartford
A multi-vehicle crash temporarily close Interstate 84 on Tuesday night.
The crash happened around 8:30 p.m. and involved four cars, according to the Hartford Fire Department.
Fire crews arrived at the scene and helped one of the drivers who was trapped. The driver was then taken to a local hospital for evaluation and treatment.
Four other people reported minor injuries but declined ambulance treatment at the scene, officials said.
I-84 East was temporarily shut down as crews responded but has since reopened.
The Connecticut State Police is investigating the crash.
Connecticut
Sleet, freezing rain leading to treacherous travel in parts of Connecticut
As the snow turns to sleet and freezing rain in parts of the state this afternoon, it is causing some treacherous travel on Connecticut roads.
The Connecticut Department of Transportation is reporting several crashes.
There are crashes on both sides of Interstate 691 in Meriden.
A tractor-trailer jackknifed on the eastbound side of I-691 between Exit 5 and 3, closing the left lane. On the westbound side, a single-vehicle crash closed the left lane.
There is a two-vehicle crash on I-91 North in Middletown between Exits 20 and 21. The left and center lanes are closed.
A multi-vehicle crash has closed lanes of I-84 East in Waterbury between Exits 25 and 25A. There is a second crash on I-84 East in Southington near Exit 30.
In Cromwell, a two-vehicle crash closed the right lane of Route 9 North in Cromwell.
On Route 9 South, a crash closed a lane on the southbound side.
-
World7 days agoExclusive: DeepSeek withholds latest AI model from US chipmakers including Nvidia, sources say
-
Massachusetts1 week agoMother and daughter injured in Taunton house explosion
-
Denver, CO7 days ago10 acres charred, 5 injured in Thornton grass fire, evacuation orders lifted
-
Louisiana1 week agoWildfire near Gum Swamp Road in Livingston Parish now under control; more than 200 acres burned
-
Florida4 days agoFlorida man rescued after being stuck in shoulder-deep mud for days
-
Wisconsin3 days agoSetting sail on iceboats across a frozen lake in Wisconsin
-
Maryland4 days agoAM showers Sunday in Maryland
-
Oregon5 days ago2026 OSAA Oregon Wrestling State Championship Results And Brackets – FloWrestling