Kentucky
Kentucky to receive $9 million in settlement with Johnson & Johnson – The Lexington Times
Republished from Kentucky Lantern
Kentucky is set to receive more than $9 million over the next four years following a national settlement with Johnson & Johnson over products containing talc, the attorney general’s office announced Wednesday.
The company agreed to pay out $700 million after Kentucky — along with 42 other states and Washington D.C. — investigated the company for an alleged connection between baby and other powder products and cancer.
J&J hasn’t admitted to wrongdoing, Reuters reported, but will stop selling the products of concern. As part of its settlement, Kentucky is set to receive $9,381,168.34 over the next four years. That’s about $2.3 million a year.
“Our Office works diligently to protect Kentucky families from potentially dangerous products,” Attorney General Russell Coleman said in a statement. “The Attorney General’s Office of Consumer Protection helps Kentuckians rest assured when they go to the store, they find safe and reliable products for their family.”
It’s not yet clear how Kentucky will spend its settlement money.
Kentucky Lantern is part of States Newsroom, a network of news bureaus supported by grants and a coalition of donors as a 501c(3) public charity. Kentucky Lantern maintains editorial independence. Contact Editor Jamie Lucke for questions: info@kentuckylantern.com. Follow Kentucky Lantern on Facebook and Twitter. Kentucky Lantern stories may be republished online or in print under Creative Commons license CC BY-NC-ND 4.0.
Donate to Kentucky Lantern here.
Kentucky to receive $9 million in settlement with Johnson & Johnson
Kentucky
Hardley Gilmore returns to Kentucky Football
A wide receiver from Belle Glade, Florida, Gilmore totaled 28 receptions for 313 yards and one touchdown for the Wildcats during the 2025 season. The 6-foot-1 sophomore has had a very interesting offseason as he entered the portal, flipped a commitment, and is now back in Lexington.
After the 2025 season, Gilmore committed to Louisville when he entered the transfer portal, then flipped his commitment to Baylor, and ultimately signed with the Bears. To end Gilmore’s portal saga, he’s now back in a familiar place with the Wildcats.
When the 2026 season begins, Gilmore will have two years of eligibility remaining.
Gilmore had a solid sophomore campaign with the Wildcats, appearing in all 12 games. His best game of the season came in the late-season loss against Vanderbilt. He tallied six catches for 55 yards in the game.
With Kentucky losing most of its wide receiver production from last season, this is a significant pickup, and it won’t be surprising if Gilmore is back in the starting lineup this fall.
Kentucky
Kentucky vs. Texas A&M Injury Report: The usual suspects are out
As for the Aggies, the only name on the report is Mackenzie Mgbako, a one-time Kentucky target who remains out for the season after undergoing foot surgery. Texas A&M head coach Bucky McMilan said today that Mgbako will return next season, which would be a big boost for the Aggies before the offseason begins.
Kentucky vs. Texas A&M Injury Report
Kentucky
Watch: Blast brings down Northern Kentucky bridge
COVINGTON, Ky. (WKRC) – The Licking River Bridge was demolished Monday morning in a controlled blast, clearing the way for a replacement structure.
Authorities established a 1,000-foot safety perimeter, closed nearby roads and asked residents to shelter in place before the demolition. The bridge collapsed within seconds of the blast.
“Today we say goodbye to a bridge that has served Kentuckians for nearly a century and we make room for something new. A signature bridge that is safer, stronger and we make room for something new,” Gov. Andy Beshear said. “This region, like the rest of the commonwealth, is evolving, it is booming, it’s economy growing every day. What we’re doing together is building our new Kentucky home.”
The Licking River Bridge is now history after crews brought it down with a controlled demolition Monday morning. (WKRC)
BE THE FIRST TO COMMENT
Crews will begin construction on the new bridge after debris removal is complete. The replacement bridge is expected to open in the summer of 2028.
-
World6 days agoExclusive: DeepSeek withholds latest AI model from US chipmakers including Nvidia, sources say
-
Massachusetts6 days agoMother and daughter injured in Taunton house explosion
-
Denver, CO6 days ago10 acres charred, 5 injured in Thornton grass fire, evacuation orders lifted
-
Louisiana1 week agoWildfire near Gum Swamp Road in Livingston Parish now under control; more than 200 acres burned
-
Oregon4 days ago2026 OSAA Oregon Wrestling State Championship Results And Brackets – FloWrestling
-
Florida2 days agoFlorida man rescued after being stuck in shoulder-deep mud for days
-
Technology1 week agoArturia’s FX Collection 6 adds two new effects and a $99 intro version
-
News1 week agoVideo: How Lunar New Year Traditions Take Root Across America