Connect with us

Pittsburg, PA

Steelers CB Named Breakout Candidate

Published

on

Steelers CB Named Breakout Candidate


PITTSBURGH — The future appears bright for the Pittsburgh Steelers after making some smart additions via the NFL Draft over the past two offseasons and one of their newest additions could evolve into a star soon.

Dan Pizzuta of The 33rd Team named the Steelers’ 2023 second-round pick Joey Porter Jr. as one of seven candidates for a breakout season in 2024.

“If there’s one way to respect a cornerback, it’s to avoid him in coverage. Porter had the seventh-lowest rate of targets per coverage snap among corners, which is partly why his raw production numbers aren’t awe-inspiring,” Pizzuta said. “It’s a sign of good coverage, not a lack of production. Porter will go into Year 2 as the clear top corner for the Steelers’ defense on a pass-coverage unit that was improved this offseason.” 

Porter Jr. got his feet wet during his rookie season and eventually took over No. 1 cornerback duties down the stretch of the regular season, which was desperately needed as the Steelers dealt with a depleted defensive backfield.

Advertisement

Last season, the Steelers took their time integrating Porter into the defense but he will hit the ground running in 2024, with his team facing a pivotal season surrounded by high expectations.

Make sure you bookmark All Steelers for the latest news, exclusive interviews, film breakdowns and so much more!

Subscribe to the All Steelers YouTube Channel



Source link

Advertisement

Pittsburg, PA

Steeler, voted the cutest TSA dog in America, stars in downloadable calendar

Published

on

Steeler, voted the cutest TSA dog in America, stars in downloadable calendar






Source link

Continue Reading

Pittsburg, PA

Corey O’Connor will begin his term as mayor with a focus on growth and families

Published

on

Corey O’Connor will begin his term as mayor with a focus on growth and families






Source link

Continue Reading

Pittsburg, PA

Pittsburgh Regional Transit retiring Fifth Avenue bus lane in Oakland

Published

on

Pittsburgh Regional Transit retiring Fifth Avenue bus lane in Oakland


Some big changes are coming to Oakland for Pittsburgh Regional Transit riders, all of which include closures, construction, and the future of safety.

Riders who typically catch the bus on Fifth Avenue in Oakland should start preparing because starting Sunday, Pittsburgh Regional Transit says the bus lane on Fifth Avenue will be permanently retired.

It’s a part of their University Line project, designed to create a more reliable connection between Downtown, Uptown, and Oakland.

But without the Fifth Avenue bus lane, traffic is shifting.

Advertisement

“All of our bus operational movements are going to be moving over here to Forbes Avenue,” said Amy Silbermann, chief development officer with Pittsburgh Regional Transit.

For riders, this means big changes.

Seventeen outbound bus stops along Fifth Avenue will be eliminated, 9 bus routes will be rerouted, and all outbound buses will travel on Forbes with general traffic.

“Forbes Avenue is going to be more congested. We will have more buses than today,” Silbermann noted.

While the closure is permanent, the construction and renovation will be temporary, and part of a much bigger plan.

Advertisement

“Ultimately, that lane is going to turn into a two-way protected bicycle facility. All buses will remain on Forbes Avenue outbound for as long as we know,” Silbermann said.

This change will now leave Forbes as the main bus corridor.

“Ultimately, one lane on Forbes Avenue is going to become a bus-only lane. However, that’s not happening until later next year.”

In the meantime, PRT says it’s working with the city and Port Authority police to keep traffic moving. The entire project is expected to be completed by 2027.

“This is not about making buses rapid. This is about making buses move more reliably and continuously throughout the corridor,” Silbermann said. “Today, they get very bunched up because of the conditions. Once they get bunched up, they end up with big gaps in service, where you may wait a really long time and then get on a really overcrowded bus.”

Advertisement

PRT says they will have staff at select bus stops to help navigate through this transition. 



Source link

Advertisement
Continue Reading
Advertisement

Trending