Connect with us

Massachusetts

Two stabbed at Cedar’s Mediterranean Foods plant in Haverhill

Published

on

Two stabbed at Cedar’s Mediterranean Foods plant in Haverhill


Two people were seriously injured in a stabbing at the Cedar’s Mediterranean Foods manufacturing facility in Haverhill, Massachusetts, on Tuesday morning.

Haverhill police said they responded to the Cedar’s plan on Foundation Avenue around 10:30 a.m. for a report of a disturbance involving a weapon. When they arrived, they found two people suffering from apparent stab wounds.

Both people were provided with medical assistance on scene and taken to area hospitals with what police described as serious injuries. Their names have not been released, and no update on their conditions was immediately available.

Preliminary investigation determined that the two people knew each other, and police said there is no ongoing threat to the public. They said their investigation into the incident remains active.

Advertisement



Source link

Massachusetts

Monson’s Church Manufacturing Dam removed, Chicopee Brook restored

Published

on

Monson’s Church Manufacturing Dam removed, Chicopee Brook restored


MONSON, Mass. (WWLP) – The Massachusetts Division of Ecological Restoration (DER) has overseen the complete removal of the 170-year-old Church Manufacturing Dam in Monson.

The project, which has resulted in a free-flowing Chicopee Brook, is now in its planting and ecological restoration phase.

This effort represents one of the region’s most significant river-restoration milestones this year. The ongoing work aims to improve flood resilience, water quality and wildlife habitat in the area. It also reduces long-term public safety risks while strengthening climate resilience for the community.

Following the completion of construction, residents can now observe a restored, free-flowing Chicopee Brook. This is where the 170-year-old dam had stood for generations, allowing the brook to run unimpeded.

Advertisement

The area that once comprised the dam’s impoundment, covering 14 acres, is actively transitioning. This space is becoming new wetlands and native habitat, fostering a more natural ecosystem.

Beyond ecological benefits, the dam removal project addresses critical community concerns. It reduces long-term public safety risks and strengthens the overall climate resilience of the Monson area.

All facts in this report were gathered by journalists employed by WWLP. Artificial intelligence tools were used to reformat information into a news article for our website. This report was edited and fact-checked by WWLP staff before being published.

Local News Headlines

Advertisement