Connect with us

Boston, MA

Many say Boston’s Copley Square has lost its charm with new design

Published

on

Many say Boston’s Copley Square has lost its charm with new design


Copley Square Park was once a green space, but after a multi-year remodel, it was partially reopened with a new design that many Bostonians aren’t loving. The grass has been replaced with cement pathways meant to make gathering easier.

‘Brick and concrete’

Bostonians are voicing their displeasure over the new concrete jungle.”There’s … seems to be just kind of brick and concrete … something,” said Tedd York, who eats his lunch in the park.

“Before, it was a beautiful field, lots of space to gather and have picnics, and people are sad that we lost it,” said Rosa Bestmann, another neighbor who had her lunch in the plaza.

People have a slew of adjectives and analogies to describe the new space. One person called it “sterile and soulless.” He said Copley went from a park to a skatepark.

Advertisement

“When I visited as a kid, my Dad lived here, and we’d always sit in the plaza on the grass,” said Bestmann. “I’m happy that it’s back. I think that a community space is a space.”

Green spaces coming

The park has been closed since July 2023. Since then, it has been undergoing an $18.9 million overhaul. Mayor Michelle Wu announced a partial reopening of the park before the Boston Marathon, and now she is hearing the critiques.  

“This is the result of months and months of community conversations, and so I am excited for what this will mean – a more walkable, vibrant space for everyone,” said Wu.

Renderings of the design do show smaller lawn spaces in the back of the park. However, those are currently under construction. There is a yellow tulip feature at one end of the park that is drawing plenty of onlookers. Right now, it is the only green space in the park.

Beyond the aesthetics, the long completion time has some folks cracking Big Dig jokes. The expectation is that the city will continue its remodel through the spring by finishing the fountains and lawn areas. By then, it may show shades of its old self.

Advertisement

“There’s a tortoise and a hare (statue). I don’t know if that’s a joke because it took so long,” laughed York.

Advertisement



Source link

Boston, MA

Canvas reportedly reaches deal with hackers for stolen data – Boston News, Weather, Sports | WHDH 7News

Published

on

Canvas reportedly reaches deal with hackers for stolen data – Boston News, Weather, Sports | WHDH 7News


BOSTON (WHDH) – The maker of the online learning platform Canvas has reportedly reached a deal wit the hackers who took down the site last week to get their data back.

The company did not reveal what was given to the hackers in exchange for the return of more than 275 million users’ data, but said they confirmed the data was detroyed.

Canvas was down for several hours last week because of the cyberattack.

The hacking group said nearly 9,000 schools worldwide were impacted, including Harvard University.

Advertisement

They said they accessed billions of private messages and personal information.

(Copyright (c) 2026 Sunbeam Television. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.)

Join our Newsletter for the latest news right to your inbox



Source link

Advertisement
Continue Reading

Boston, MA

What we know about accused Memorial Drive gunman Tyler Brown

Published

on

What we know about accused Memorial Drive gunman Tyler Brown


Investigators identified Tyler Brown of Boston as the man who allegedly opened fire on Memorial Drive in Cambridge, Massachusetts, leaving two victims with life-threatening injuries.

Middlesex County District Attorney Marian Ryan said Brown fired 50 to 60 shots on the busy road shortly after 1 p.m. Monday.

Two male victims were hit in vehicles, Ryan said. They are in critical condition and fighting for their lives.

A Massachusetts State Police trooper and a civilian with a license to carry a firearm went toward the gunman and fired their weapons at him. Officers treated Brown at the scene, and he was brought to a Boston hospital, where he is in intensive care, according to the district attorney.

Advertisement

This video shared with NBC10 Boston appears to show a man opening fire at cars on Memorial Drive in Cambridge, Massachusetts, on Monday, May 11, 2026.

Authorities have, so far, shared limited information about the suspect.

“Mr. Brown is from Boston, and apparently was in the process of moving here. We understand that Mr. Brown was under the supervision of either the Massachusetts Probation Department or Department of Parole,” Ryan said.

She did not elaborate on why Brown may have been on probation or parole.

“We will address Mr. Brown’s criminal record, if any, at the arraignment,” she said.

Advertisement

Ryan added that she did not know enough about Brown’s condition to say whether he would be arraigned in court or in a hospital bed. The timing was also not clear.

He will face two counts of armed assault with intent to murder and firearms charges, and “a variety of other charges as we unfold what took place, exactly, and we have a chance to speak to the many, many people who were out there,” Ryan said.



Source link

Advertisement
Continue Reading

Boston, MA

Portion of Storrow Drive, Soldiers Field Road will close nightly through August – The Boston Globe

Published

on

Portion of Storrow Drive, Soldiers Field Road will close nightly through August – The Boston Globe


An inbound stretch of Storrow Drive and Soldiers Field Road will be closed each night through August for tunnel repairs, officials announced.

Starting Monday, the closures will begin at 8 p.m. and last until 5 a.m., state officials said.

Road closures begin at North Harvard Street in Allston and stretch along the Charles River Esplanade to Mugar Way in Boston, near the Hatch Memorial Shell, officials said.

Traffic will be detoured into Cambridge over the Anderson Bridge, along Memorial Drive, and then be routed into Boston over the Longfellow Bridge.

Advertisement

The closures will allow ongoing repairs to the Storrow Drive Tunnel in the Back Bay. The work is the first phase of a two-stage project to extend the lifespan of the tunnel, which carries roughly 50,000 drivers to and from downtown Boston daily.

The outbound portion of the tunnel and accompanying roadways will not be affected.

State transportation officials said changes to the work schedule will be made when necessary to minimize impacts during major local events at TD Garden, Fenway Park, or during the FIFA World Cup and 250th anniversary celebrations scheduled for this summer.

Additional changes may be made without notice due to weather.

Transportation officials have not specified when the closures will end.

Advertisement

Bryan Hecht can be reached at bryan.hecht@globe.com. Follow him on Instagram @bhechtjournalism.





Source link

Continue Reading
Advertisement

Trending