South-Carolina

South Carolina nuclear plant gets warning over another cracked emergency fuel pipe

Published

on


Federal officials have issued a warning about a substantial safety violation at a South Carolina nuclear plant after cracks were discovered again in a backup emergency fuel line.

Small cracks have been found a half-dozen times in the last 20 years in pipes that carry fuel to emergency generators that provide cooling water for a reactor if electricity fails at the V.C. Summer plant near Columbia, according to the U.S. Nuclear Regulatory Commission.

The agency issued what it calls a preliminary “yellow” warning to plant owner Dominion Energy last week.

Advertisement

It is the second most serious category and only seven similar warnings have been issued across the country since 2009, nuclear power expert David Lochbaum told the State newspaper after reviewing records from federal regulators.

The commission’s ruling is not final and Dominion will have a chance to explain what happened, utility spokesman Darryl Huger told the paper in an email.

Dominion has already started to put in place a plan to improve the reliability of the backup system, Huger said.

A crack first appeared on a diesel fuel pipe in 2003, and similar pipes have had other cracks since then.

During a 24-hour test of the system in November, a small diesel fuel leak grew larger, according to NRC records.

Advertisement

The agency issued the preliminary yellow warning because of the repeated problems.

Virginia-based Dominion hasn’t been the only owner of the plant. SCANA Corp. built and started the plant in 1984. The South Carolina company had plans to build two more reactors, but billions of dollars of cost overruns forced it to abandon the project in 2017 and sell to Dominion.

Dominion has recently requested to renew the license for the nuclear plant for an additional 40 years.

Longtime nuclear safety advocate Tom Clements told the newspaper that the pipe problems should mean a lot more scrutiny by regulators.

“This incident serves as a wake-up call to fully analyze all such systems prior to a license-renewal determination,’’ Clements said in an email.

Advertisement



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Trending

Exit mobile version