Nevada

LPO Announces $2.26B Loan to Nevada Lithium Processing Plant

Published

on


Looking to read the full article? Scroll down and login or sign up today!

Page Reload Scroll Position

LPO Announces $2.26B Loan to Nevada Lithium Processing Plant

Thacker Pass Mine, Plant to Produce 40,000 MT of Lithium per Year, All for GM

Advertisement
A computer simulation of the Thacker Pass processing plant, which is expected to produce 40,000 MT of battery-grade lithium carbonate per year.

A computer simulation of the Thacker Pass processing plant, which is expected to produce 40,000 MT of battery-grade lithium carbonate per year. | Lithium Americas


|

With site preparation now complete, Lithium Americas is estimating a three-year construction period at Thacker Pass, with the mine and plant producing at full capacity in 2028.



Source link

Advertisement

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Trending

Exit mobile version