North Carolina
Tree removal at North Carolina church unearths centuries-old artifacts
(CNN) — When not leading sermons, the Rev. Daniel Cenci is quite the history buff.
Cenci’s two passions coincided when a plethora of centuries-old items were found June 20 in the yard of Christ Episcopal Church in Elizabeth City, North Carolina, where Cenci has served as rector since 2019.
He said the church’s construction crew was digging up a century-old magnolia tree when the mundane quickly turned into something extraordinary around lunchtime. The crew had hit something while digging up a pit for drainage underneath the stump.
When Cenci saw the almost dome-like shape of the structure the crew had hit, he thought it was a crypt or an unmarked soldier’s grave given the many battles fought in eastern North Carolina during the Civil War.
Cenci enlisted the help of a nearby parishioner to poke around. Soon, the two had pulled out a bone that was eight inches long.
“I thought, ‘Oh gosh, maybe that’s a crypt after all,’” Cenci told CNN.
After telling the construction crew to go home for the day, artifacts like pottery, old and broken dishes, glassware, bottles and more bones were unearthed from the loose, sandy terrain filled with bricks.
With guidance and inspection from a local museum and a specialist in early porcelain dating, the items were roughly dated from the early 1700s up through the mid-1800s. The bones didn’t belong to human bodies but to animals – including a possible jawbone from a wild boar.
“The guess right now is maybe (the spot) is either a root cellar that was associated with an early home or a cistern for water storage, again associated with another early home in the city,” Cinci said.
After the state office agreed with the artifacts’ initial dating estimate, they were labeled and placed on plates in the church’s kitchen until they can be sent to the state office’s conservation laboratory for testing.
Cenci was told that either a team from the Raleigh or Greenville archeology offices would return to the site, a graduate student from a local university would be tasked with continuing the excavation or the church could hire an outside archaeological firm.
CNN has reached out to the state office of archaeology in Raleigh for comment.
Christ Episcopal Church was founded in 1825 but the building it currently occupies wasn’t built until 1856, according to Cenci.
From research done by church parishioners Ian Lowry, Robyn Nix and Sam Mancla, who dug into deeds, wills and estate documents at the Pasquotank County courthouse, the group has discovered a Black man named George Davis used to own the property in the early 1800s that the church sits on – on two of the most premier lots in the city.
His daughter Charlotte was married in the Episcopal church in 1833, according to church records and as posted by Lowry on Facebook. Nothing is confirmed yet, but some of the artifacts are thought to have been owned by Davis, Cenci explained.
“(Davis) did very well for himself based on the items that have come out of the excavation site,” Cenci said. “We’ve found bottles of French wine and we found imported porcelain from China … It seems we have uncovered the history of an early African American in our community that was quite influential (and) quite affluent in the town which I think is really interesting.”
Cenci said all he did was stop the construction; Lowry, Nix and Mancla are “really the heroes in this story as far as finding out what was in there and why it matters.”
With the church being founded in 1825, this discovery comes just in time for its 200th anniversary.
“As a Christian, I believe it’s God’s providential timing that it would happen right as we’re coming into our 200th anniversary,” Cenci said. “We’re getting this – almost like a time capsule – back to when the church was founded.”
The-CNN-Wire
™ & © 2024 Cable News Network, Inc., a Warner Bros. Discovery Company. All rights reserved.
North Carolina
North Carolina man accused of shooting and killing another tourist inside of a Broward Airbnb, police say
A Fourth of July trip to South Florida ended in tragedy after a 21-year-old North Carolina man was shot and killed inside a Hollywood Airbnb, according to police.
Investigators say Jaydon Williams, 21, was shot multiple times early Saturday morning at a vacation rental in the 1900 block of Funston Street. Hollywood police have arrested 21-year-old Devian Blount, also of North Carolina, and charged him with first-degree murder.
Officers responded to the home around 1 a.m. Saturday, following reports of a shooting. They arrived to find Williams suffering from multiple gunshot wounds. He was transported to Memorial Regional Hospital, where he died.
According to the arrest report, Williams was on a FaceTime call with his girlfriend at the time of the shooting. She told investigators she heard someone accuse Williams of stealing, followed by a verbal argument and several gunshots.
The incident has left neighbors shaken in the typically quiet Hollywood community. While some residents noted they were aware that the home operated as a short-term rental, others expressed concerns about the property’s transient nature.
“That’s a bad idea to me to have an Airbnb in this neighborhood where so many people and kids live,” said neighbor Dorell Green. “Different types of people come and go. You don’t know who is coming or leaving.”
Ivette Santana, another resident, said her primary concern is the violence. “I don’t care about the Airbnb,” Santana said. “My problem is the shooting over there.”
Blount is being held without bond at the Broward County Jail.
CBS News Miami has contacted Airbnb to determine if the property remains in operation. We are also working to contact the property’s owners.
North Carolina
Sickness causing explosive diarrhea reportedly reaches 145 cases in North Carolina
The video above is a live stream of WBTV and affiliated programming, and may not be directly related to the article below.
CHARLOTTE, N.C. (WBTV) – A sickness causing explosive diarrhea across the United States has been reported in North Carolina.
State health officials confirmed on Tuesday, July 7, that at least 145 cases of cyclosporiasis had been reported in North Carolina since May 1.
According to the state’s health website, cyclosporiasis is an intestinal illness caused by a parasite known as cyclospora. Sickness is often brought on by consuming food or water that is contaminated with the parasite.
The state’s website says it usually takes a week for symptoms to show up after consuming the contaminated food or water.
Among the symptoms are:
- Watery diarrhea with frequent, sometimes explosive bowel movements
- Loss of appetite
- Weight loss
- Stomach cramps/pain
- Bloating
- Increased gas
- Nausea
- Fatigue
Health officials said cyclospora is often associated with fresh herbs and produce that are served uncooked. They said because those items often go uncooked, it is imperative for them to be cleaned prior to eating.
According to the CDC, healthy people who contract cyclosporiasis usually recover without treatment but may have symptoms for a few days to a month or longer. In other cases, the sickness can be treated with antibiotics.
As of mid-June, the CDC reported cyclosporiasis cases in 17 states. At that point, no deaths had been reported.
Also Read: One US state is now reporting 700+ cases of ‘explosive’ diarrhea linked to parasite
Copyright 2026 WBTV. All rights reserved.
North Carolina
Manns Harbor Bridge repairs to be ‘most complete’ in decades | Coastal Review
As the Manns Harbor Bridge over the Croatan Sound nears its 70th birthday, it’s getting what North Carolina Department of Transportation Resident Engineer Pablo Hernandez recently called “the first major renovation that I’m aware of in my 28-, almost 29-year career here in Dare County.”
The bridge, he added quickly, needs work, but overall, “the fact is that we got almost 70 years out of it without a tremendous amount of maintenance investing.”
Hernandez also added that the work that had been done, mainly minor concrete repairs and a paint job about every 25 to 30 years, “but the current project seems to be the most complete.”
When the William B. Umstead Bridge, as it is officially known, opened to traffic in December 1956, Outer Banks newspaper the Coastland Times described it as “a fine Christmas present for the Southern Albemarle region,” adding that it “will make possible a lot of holiday visiting, particularly on the Dare County mainland.”

The bridge connects mainland Dare County with Roanoke Island and the Outer Banks. This delivered 20th century amenities to the isolated hamlets and towns of mainland Dare County that had yet to be electrified. With the bridge carrying connections for electric power and telephones, “some eight families will have electric lights for the first time” in the sleepy fishing village of Mashoes. And in the longstanding, unincorporated Manns Harbor community, “the bridge makes possible modern telephone,” the Coastland Times reported.
Although the bridge may appear to be in surprisingly good shape, it is a solid 40 years beyond its expected lifespan, and when the $33.75 million project began in summer 2023, uncertainty remained about the extent of repairs needed.
The original price tag has risen: “Estimated projections of total costs are currently around $45 million,” Hernandez wrote in an email. “We are doing what we can to control the costs but not to the detriment of the structure.”
“Until you’re there, you don’t know what you’re going to find, just like with an old house,” Hernandez said, “you start renovating it, and things need attention.”
The project is a blend of modern materials and traditional, often hands-on applications. Resurfacing the deck, for example, was completed using an epoxy that included an aggregate material to provide a textured surface. During the application process, the bridge was closed for nine months.

“All of those layers of the epoxy, as well as the aggregate to provide the textured surface, were all applied by hand, so over 300,000 square feet of bridge deck was rolled and squeegeed with these four separate layers of epoxy,” Hernandez explained.
The decision to apply the new surface in this way, instead of using “specialty trucks and pavers,” was in part because of the bridge’s 70-year-old design and the weight of the materials. “We don’t put a lot of what we call dead load on the bridge,” said Hernandez.
Other factors were also considered. “The deck was in surprisingly solid, good condition,” Hernandez said, “so there was no need to remove an inch just to put back another inch.”
The epoxy used is a viscous material that seals any cracks that may have developed.
Hernandez said the bridge design has a “certain robustness to begin with. It’s kind of like building a a deck on your house when you use a six-by-six post or an eight-by-eight or four-by-four post.”
Home to purple martins, pre-dedication damage
The bridge has for years been home to thousands of purple martins during summer. Hernandez, in response to Coastal Review’s query, was emphatic that the birds’ droppings had not damaged the bridge. He pointed out that the aerobatic birds roost on the bridges steel beams and atop the caps, concrete members that support the steel beams and are only there at night.
“From my experience, we have not seen a tremendous amount of bird droppings,” he said. Hernandez cited as evidence one night when he was with the Purple Martin Society conducting bird surveys. “We provided a boat and there were hundreds of thousands flying around. I don’t think anybody got nailed (with droppings).”

The most recent work has been below the bridge deck and the view down there is concerning. On the north side of the bridge, toward the mainland side, an entire piling is missing. In its place, iron girders support this part of the bridge. A March 1957 storm took out the piling before the bridge was officially dedicated the following month.
A grain barge, the C. W. Curlett “struck the bridge when it got out of control, said to have been due to the failure of one of the two motors. It swung down and struck the North side of bridge, shattering one of the huge concrete piles, so that the reinforcing steel inside it was exposed and bent,” the Coastland Times reported.
Just to the east of the bridge’s center rise, workers have been lowered to assess its condition. One worker taps the concrete with a hammer while another makes notes of their observations.
“They are listening for a hollow or dull sound,” Hernandez explained. “This indicates a deteriorated concrete layer. If it is solid, it will have a distinct sharp, pinging sound.”
Repairs to the concrete pilings are now the project’s focus. The concrete is showing its age, largely because of the limited materials available in 1956, as compared to current designs. The bridge pilings, Hernandez said, were only “mildly” reinforced. “It just has reinforcing bars in it.”

The reinforcing bars, or rebar, is exposed through cracks in the concrete. Repairs involve removing any rust from the iron and replacing the concrete. Although there is visible rust on the rebar, the one-inch bars are still in good shape with only basic maintenance needed to clean the rust and repack the concrete.
Hernandez compared the Manns Harbor Bridge pilings to those supporting the nearby new Lindsay C. Warren Bridge, aka the Alligator River Bridge, a project to replace the early 1960s-era structure that Hernandez also supervises. The pilings there are prestressed, by “basically taking a very dense and durable cable and stretching it, pouring concrete around it, and then letting that elastic force come back in (and) help squeeze the concrete together, so you get a denser piling that can go through a lot more cycles without any kind of cracking.”
Looking back: State awards $450M deal to build new Alligator River bridge
The cracks in the Umstead Bridge were not unexpected after seven decades. Temperature variations and cycles of freezing and thawing in a marine environment will cause the material to develop small fissures. Once air reaches the rebar, the iron begins to rust. Conversely, below the surface of the water, in what is considered anaerobic conditions, “the concrete is dense and sound, and the rebar is protected from water and oxygen,” Hernandez replied in an follow-up email. “The majority of the deterioration of the concrete and rebar is in the splash zone where there his ample oxygen to facilitate the corrosion process of ferrous metals.”
Repacking the piling concrete is one of the most labor-intensive, hands-on parts of the project. After removing the damaged concrete and cleaning the rebar of rust, barges form a protected area around the work zone under the bridge. On a barge deck, workers mix Speed Crete Blue Line, a product described by Hernandez as a “rapid-setting underwater concrete repair mortar.” According the manufacturer, Euclid Chemical, the product will set in three to five minutes after coming in contact with water.
Three divers are also employed in the repairs, reaching into buckets of mortar, pulling out a handful and pushing it into the voids and continuing the process until the piling is back to its original specs.
The mortar creates an airtight seal, protecting the rebar inside the piling. Then the pilings get an additional layer of protection.
“After we do the concrete piling, we come back with an epoxy-saturated carbon-fiber sheet of fabric and wrap that around the piling shell,” Hernandez said.
The bridge is considered one of the state’s “high-value bridges,” Hernandez said, referring to bridges within a $50 to $70 million range replacement cost.
Hernandez noted an NCDOT assessment of the bridge that asked, “Could we invest in a significant bridge preservation effort to get another 20, 30 or 40 years of life out of those structures?”
The repairs, Hernandez said, are going well, but the work originally slated for a Nov. 26 completion date that is “around the corner,” is unlikely to wrap up as scheduled. “Unfortunately we’re not going to be complete with the concrete repairs.”
-
Tennessee7 minutes ago
In-N-Out’s fifth Tennessee location is opening soon. Here’s how many stores are planned
-
Texas10 minutes agoTriple-digit heat returns to North Texas before weekend storms bring relief
-
Utah15 minutes agoPlanned 60-foot long Liberty Arch in Utah sparks patriotism, but also concerns
-
Vermont22 minutes agoVermont offers money to replace diesel vehicles with electric
-
Virginia25 minutes agoVirginia reports 10 cases of cyclosporiasis
-
Washington30 minutes agoWashington law says to alert the public when doctors are accused of misconduct. It can take months
-
Wisconsin37 minutes agoFormer Wisconsin judge to be sentenced after conviction in obstructing arrest of Mexican immigrant
-
West Virginia40 minutes agoWest Virginia town’s entire police force fired after ex-sergeant claims evidence room was broken into