Dallas, TX
TxDOT Dallas Seeks Input on Proposed Widening of FM 740/FM 548
The Texas Department of Transportation Dallas District is preparing for in-personal and virtual public hearings on the proposed widening of FM 740/Fm 548.
TxDOT Dallas posted a reminder about the meetings to its social media page on Thursday afternoon.
The purpose of the hearings are to gather public input and provide more information about the proposed reconstruction and widening of FM 740/FM 548 from I-20 to FM 1641 in Mesquite and Forney within Kaufman County.
According to TxDOT, the proposal includes reconstruction of FM740/Fm 548 from a two-lane rural roadway to a four-lane divided urban roadway with raised medians, curb and gutter, a bridge widening at the Mustang Creek crossing, and a 10-foot-wide shared-use path on both sides of the road for approximately four miles.
The roadway passes through the cities of Mesquite and Forney. The existing right-of-way width ranges from 60 feet (along FM 740) to 150 feet (along FM 548). Where proposed right-of-way is needed, the width is generally 130 feet wide.
That means the proposed project would potentially displace three residential and one non-residential structures. Relocation assistance is available for displaced persons and businesses.
The in-person meeting is scheduled for Thursday, April 16 from 5:30-7:30 p.m. at Forney High School (1800 College Ave.).
The virtual hearing will start at 5:30 p.m. and will consist of a prerecorded video presentation. It will remain online for at least the next 15 days and materials can be viewed at any time during that period.
Anyone without internet access may call 214-320-4431 between 8 a.m.-5 p.m. to ask questions and access project materials during the project development project.
View the project materials online here. The materials will also be available in hard copy form for review at the in-person session.