Connect with us

South Dakota

Blake Ellwein is South Dakota’s Mr. Basketball

Published

on

Blake Ellwein is South Dakota’s Mr. Basketball


HURON, S.D. (Dakota News Now) -The Mr. Basketball Award goes to Huron’s Blake Ellwein who will take his talents to play in Brookings for South Dakota State.

Ellwein had a great career for the Huron Tigers capped off by his senior season when he led them to the State AA title.

He became the Tigers all-time leading scorer in the process, breaking his father’s record. He averaged 22 points per game his senior season.

Copyright 2026 Dakota News Now. All rights reserved.

Advertisement



Source link

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

South Dakota

Rapid City’s Jonasia Nance crowned Miss South Dakota for America Strong 2026

Published

on

Rapid City’s Jonasia Nance crowned Miss South Dakota for America Strong 2026


RAPID CITY, S.D. (KOTA) – Rapid City resident Jonasia Nance has been crowned Miss South Dakota for America Strong 2026 and will represent the state at the national Miss for America Strong pageant in August, according to South Dakota America Pageants.

Nance, an active-duty member of the U.S. Air Force, previously competed as Miss Pennington County for America Strong 2026. Her advocacy platform centers on improving access to food and essential resources for underserved families and individuals.

Rapid City resident and active-duty U.S. Air Force member Jonasia Nance was crowned Miss South Dakota for America 2026 and will compete nationally in August.
(South Dakota America Pageants)

She has volunteered with Feeding South Dakota since 2022, helping with food packaging and distribution efforts in Rapid City and Box Elder. Nance has also supported Fork Real Community Café outreach efforts and remained active with Black Hills Community Theatre since 2021, contributing both on stage and behind the scenes.

Nance is currently pursuing a Bachelor of Science in business administration through Western Governors University and has earned her CompTIA Security+ certification.

Advertisement

As Miss South Dakota for America 2026, she will continue community advocacy efforts while preparing to compete on the national stage later this year.

See a spelling or grammatical error in our story? Please click here to report it.

Do you have a photo or video of a breaking news story? Send it to us here with a brief description.

Copyright 2026 KOTA. All rights reserved.



Source link

Advertisement
Continue Reading

South Dakota

SD Lottery Mega Millions, Millionaire for Life winning numbers for May 19, 2026

Published

on


The South Dakota Lottery offers multiple draw games for those aiming to win big.

Here’s a look at May 19, 2026, results for each game:

Winning Mega Millions numbers from May 19 drawing

10-26-34-56-64, Mega Ball: 06

Check Mega Millions payouts and previous drawings here.

Advertisement

Winning Millionaire for Life numbers from May 19 drawing

05-06-42-44-47, Bonus: 03

Check Millionaire for Life payouts and previous drawings here.

Feeling lucky? Explore the latest lottery news & results

Are you a winner? Here’s how to claim your prize

  • Prizes of $100 or less: Can be claimed at any South Dakota Lottery retailer.
  • Prizes of $101 or more: Must be claimed from the Lottery. By mail, send a claim form and a signed winning ticket to the Lottery at 711 E. Wells Avenue, Pierre, SD 57501.
  • Any jackpot-winning ticket for Dakota Cash or Lotto America, top prize-winning ticket for Lucky for Life, or for the second prizes for Powerball and Mega Millions must be presented in person at a Lottery office. A jackpot-winning Powerball or Mega Millions ticket must be presented in person at the Lottery office in Pierre.

When are the South Dakota Lottery drawings held?

  • Powerball: 9:59 p.m. CT on Monday, Wednesday, and Saturday.
  • Mega Millions: 10 p.m. CT on Tuesday and Friday.
  • Lucky for Life: 9:38 p.m. CT daily.
  • Lotto America: 9:15 p.m. CT on Monday, Wednesday and Saturday.
  • Dakota Cash: 9 p.m. CT on Wednesday and Saturday.
  • Millionaire for Life: 10:15 p.m. CT daily.

This results page was generated automatically using information from TinBu and a template written and reviewed by a South Dakota editor. You can send feedback using this form.



Source link

Advertisement
Continue Reading

South Dakota

One of world’s largest energy storage plants launches in South Dakota

Published

on

One of world’s largest energy storage plants launches in South Dakota


This small city in rural northeastern South Dakota has established itself as an energy hub for the entire Great Plains region, and that reputation has received a big boost by landing what will be among the world’s largest energy storage projects.

In a groundbreaking project, South Dakota-based POET has partnered with Antora Energy of California to launch a thermal energy storage system adjacent to POET’s ethanol plant in Big Stone City.

The 5 gigawatt-hour thermal energy storage facility will absorb excess, low-cost energy from wind turbines that might otherwise be lost due to capacity limits on the existing power grid and store it in carbon blocks for use when needed.

Officials said the new technology will be a major economic and environmental boost to South Dakota while also pioneering the use of a new energy technology for potential use across the country and the world.

Advertisement

Developers cite potential benefits

Leaders of the two companies told News Watch in exclusive interviews that the storage facility – the first to be put in commercial production by Antora – will generate several benefits now and well into the future for South Dakota, including:

    1. The facility will improve efficiency and increase outputs at POET’s ethanol plant in Big Stone City by providing a reliable source of sustainable energy both during times of peak and non-peak power demand, ultimately reducing consumer costs for ethanol at the gas pump.

    2. It will increase production opportunities for South Dakota corn growers, who will see expanded markets for their grains to be converted into ethanol.

    3. It will reduce reliance on fossil fuels by enabling greater storage of energy generated by wind, solar or other sustainable sources.

    4. Construction and development of the plant has supported 300 new construction jobs in South Dakota and California and will generate new full-time employment in the Big Stone City area.

“They’re taking excess wind energy that doesn’t have a home on the grid and otherwise would be wasted, and they’re capturing that,” said Jeff Lautt, president and chief operating officer of POET in Sioux Falls, the world’s largest producer of ethanol.

Advertisement

“Nobody’s got a switch for the wind, so it blows when it wants to blow, yet there’s a steady demand for power that has to be met, and this system will provide for that.”

Andrew Ponec, chief executive officer of Antora Energy, was unwilling to share the total cost of the project. But a press release on the storage project noted that Antora has “catalyzed hundreds of millions in private investment in the company.”

Ponec said the majority of costs for the Big Stone project were paid through private financing, led by Grok Ventures of Australia, and not the U.S. government. He added, however, that thermal storage has received strong bipartisan support, including in the Big Beautiful Bill passed by Congress in 2025.

A May 19 press release on the project from POET and Antora included statements of support from U.S. Sens. John Thune and Mike Rounds, U.S. Rep. Dusty Johnson and South Dakota Gov. Larry Rhoden.

“America’s need for energy is continuing to rise year after year, (so) the more of that energy we can take right here at home, the better,” Rounds said in the release. ”(This) project in Big Stone City will have a real economic impact in South Dakota while also creating jobs and boosting our domestic energy production.”

Advertisement

A regional power hub set in a small town

Big Stone City was selected as the site for Antora’s first large-scale thermal energy storage system because of the existing POET biofuels plant and the Otter Trail Power Co. plant on the site, and due to the city’s location as a major hub on the regional Midcontinent Independent System Operator (MISO) power grid system, Ponec said.

“We’re an energy technology company, so we’re going to go to wherever there are big concentrations of energy users,” he said.

Thermal energy storage collects low-cost, off-peak energy from virtually any source – local wind turbines in this case – and stores it as heat in insulated blocks of solid carbon that reach 4,000 degrees Fahrenheit. The heat, which can be stored until needed, is then transferred into an oil that allows it to be carried to industrial users, in this instance the POET plant next door.

There, the heat is transferred to steam that powers boilers, distillers and other machinery used in production of ethanol and a host of other byproducts generated at the POET plant. The Big Stone plant produces 92 million gallons of ethanol annually, Lautt said.

Ponec likened the thermal storage process – which consists of dozens of large white metal boxes on the ground – to the operations of a giant toaster. Electricity from the outlet (energy from wind towers) is transferred to the toaster heating coils (the carbon blocks), which then generates heat to brown the bread (run machinery in the ethanol plant.)

Advertisement

The project uses very little water and does not create any substantial emissions, Ponec said.

To illustrate the nimble nature of thermal storage, Ponec noted that the Big Stone facility was built in less than a year. The facility is already providing power to POET’s plant and should be fully online in October.

Another type of energy storage for South Dakota

Thermal energy storage is similar to lithium ion energy storage in that both concepts seek to capture power that can be held until demand goes up and may exceed supply, thereby stabilizing the power grid and reducing costs for consumers.

But while lithium batteries store actual electricity and only for a few hours, thermal storage holds the energy as heat and can hold it for much longer periods, Ponec said.

South Dakota might soon be home to a pair of lithium battery projects, including in Codington and Brookings counties, which backers said will create new opportunities for wind and solar production in the state.

Advertisement

Antora makes money on the project by selling its energy to POET while opening the door to greater sustainable electricity production in the region and lowering power costs for the ethanol plant, Lautt said.

“It creates more efficiency for us, so we’re then using less natural gas to operate the facility, which makes us greener,” he said. “It really creates a win-win-win all across the footprint.”

___

This story was originally published by South Dakota News Watch and distributed through a partnership with The Associated Press.

Advertisement





Source link

Continue Reading
Advertisement

Trending