Iowa

Lane closures on Iowa 175 in Onawa begin on Monday, April 3 

Published

on


Posted on: March 27, 2023

SIOUX CITY, Iowa – March 27, 2023 – Drivers on Iowa 175 in Onawa want to concentrate on a development challenge which will decelerate their journey. Starting at 8 a.m. on Monday, April 3 till Oct. 1, climate allowing, site visitors will probably be decreased to at least one lane in every course as crews work to switch the Iowa 175 bridge over McCandless Cleghorn Ditch.

Assist preserve everybody on the highway safer. Drive with warning, obey the posted pace restrict and different indicators within the work space, and bear in mind that site visitors fines for transferring violations are at the very least double in work zones. As in all work zones, you must keep alert, permit ample house between autos, and put on seat belts. 

Advertisement

The most recent traveler info is out there anytime by means of our 511 system. Go to 511ia.org; name 511 (inside Iowa) or 800-288-1047 (nationwide); keep linked with 511 on Fb or Twitter (discover hyperlinks at https://iowadot.gov/511/511-social-media-sites); or obtain the free app to your cellular gadget. 

It’s straightforward to subscribe to Your 511 and signal as much as obtain e-mail/textual content alerts. Go to https://new.511ia.org/#login to enroll. For directions and assist with this characteristic, go to https://www.511ia.org/assist/part/how-to-create-and-manage-a-511-account.html.

#

For common details about this challenge contact Dakin Schultz, District 3 Workplace, at 712-274-5837 or dakin.schultz@iowadot.us

Advertisement



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Trending

Exit mobile version