Connect with us

North Carolina

Slight raises, budget cuts proposed in NC Senate state spending plan

Published

on

Slight raises, budget cuts proposed in NC Senate state spending plan


North Carolina Senate leaders are proposing a $32.6 billion budget that includes small raises and bonuses for teachers and state employees, while cutting programs and vacant positions across state government — all as they expand controversial scheduled income tax cuts.

Most state workers would get a 1.25% raise starting in July, along with bonuses totaling $3,000 over two years. Teachers would receive an average 2.3% pay raise and would also get bonuses.

Overall, the tight budget proposal would increase state spending by about $800 million, or 2.75%, over the current year — far less than budget proposals from recent years. Senate Leader Phil Berger said Republican budget subcommittee chairs looked to find cuts to make room for their spending priorities.

“They have taken a fine-tooth comb to area budgets to try to find as much cost savings as possible, from eliminating obsolete programs to slashing some of the bloated portions of the bureaucracy, all in an effort to better serve the people of the state of North Carolina,” he said at a news conference Monday.

Advertisement

Gov. Josh Stein has called on lawmakers to pause scheduled corporate and personal income tax cuts, pointing to a projected revenue decrease even as the state grows. But the Senate budget sticks to the rate cuts and even adds further cuts in future years, assuming the state hits certain revenue targets. The personal income tax rate could eventually drop as low as 1.99% under the bill; it’s currently at 4.25%.

Berger was dismissive of revenue forecasts produced by nonpartisan economists working for the legislature and Stein’s administration.

“As long as the economy continues to grow, it is our belief … that revenue to the state will be more than adequate to address the funding requirements that we have as far as the state budget is concerned,” he said.

The budget does, however, significantly increase the tax rate paid by sports betting operators.

Senate Minority Leader Sydney Batch, D-Wake, called the budget bill “a blueprint for neglect and cowardice.”

Advertisement

“It offers pathetic raises to public servants, abandons our law enforcement officers, and shortchanges the public infrastructure North Carolina desperately needs,” Batch said in a news release. “At a time when families are squeezed by rising costs, schools can’t find teachers for their classrooms, and emergency services are stretched to the brink, Senate Republicans have made the active choice to sit on billions of taxpayer dollars.”

Batch was referring to Republicans’ decision to move money back into the rainy day fund, bringing the savings amount to $4.75 billion.

Jobs, programs on the chopping block

Berger was hesitant to discuss details of proposed budget cuts during Monday’s news conference, but here are some examples in the bill:

  • Hundreds of vacant positions across numerous government agencies would be eliminated. State agency leaders have said for years that they’ve been struggling to fill positions. The budget targets those that have been vacant longest.
  • A handful of positions that aren’t vacant would be eliminated, including several jobs related to environmental justice, science and employment discrimination. Some are leadership roles, such as the chief scientist at the Office of State Budget and Management.
  • $57 million would be cut from the state’s community college system.
  • The N.C. Innocence Inquiry Commission, which investigates wrongful criminal convictions, would be eliminated.
  • The Office for Historically Underutilized Businesses would be shut down. It helps firms owned by minorities, women and people with disabilities access state government contracts.
  • PBS North Carolina would have its funding cut by $4 million, nearly half of what it receives from the state.
  • The Minority Male Success Initiative, which helps non-white students, would be eliminated.

Big policy changes tucked inside

As lawmakers have in past budgets, the Senate’s 439-page budget bill is filled with policy proposals, including the entire text of several bills that were introduced separately – some of which have already passed the Senate.

They include:

  • New tolls on state ferry services that are currently free. A trip from Hatteras to Ocracoke, for example, would cost up to $40.
  • An increase in the maximum weekly unemployment benefit from $350 to $400 (a figure the House has voted to set higher)
  • Elimination of Certificate of Need regulations on new healthcare facilities and equipment
  • A mandate that UNC-Chapel Hill and N.C. State University play against each other regularly in basketball
  • A requirement that school districts enact policies restricting students’ use of cell phones and electronic devices in the classroom.
  • The creation of a new Board of Motor Vehicles that would appoint the commissioner of the Division of Motor Vehicles (currently appointed by the secretary of transportation)
  • Legislation eliminating a mandate that Duke Energy reduce its carbon dioxide emissions by 70% before 2030

What’s next

The Senate plans to hold committee hearings on the bill Tuesday, with floor votes scheduled for Wednesday and Thursday.

That won’t be the final step in developing a spending plan. The House will develop its own proposal in the coming weeks, and then leaders from both chambers will meet privately to hash out a compromise between the two budget bills.

Advertisement

Then it’s up to Stein to decide if he’ll sign it or veto it. And if he picks the latter approach, House Republicans are one vote short of a veto-proof majority this year.

It’s also possible a budget bill might never make it to the governor’s desk. That’s what happened last year when the House and Senate couldn’t reach an agreement on the details, which meant spending levels remained unchanged from the previous fiscal year.





Source link

Advertisement

North Carolina

North Carolina man accused of shooting and killing another tourist inside of a Broward Airbnb, police say

Published

on

North Carolina man accused of shooting and killing another tourist inside of a Broward Airbnb, police say



A Fourth of July trip to South Florida ended in tragedy after a 21-year-old North Carolina man was shot and killed inside a Hollywood Airbnb, according to police.

Investigators say Jaydon Williams, 21, was shot multiple times early Saturday morning at a vacation rental in the 1900 block of Funston Street. Hollywood police have arrested 21-year-old Devian Blount, also of North Carolina, and charged him with first-degree murder.

Officers responded to the home around 1 a.m. Saturday, following reports of a shooting. They arrived to find Williams suffering from multiple gunshot wounds. He was transported to Memorial Regional Hospital, where he died.

Advertisement

According to the arrest report, Williams was on a FaceTime call with his girlfriend at the time of the shooting. She told investigators she heard someone accuse Williams of stealing, followed by a verbal argument and several gunshots.

The incident has left neighbors shaken in the typically quiet Hollywood community. While some residents noted they were aware that the home operated as a short-term rental, others expressed concerns about the property’s transient nature.

“That’s a bad idea to me to have an Airbnb in this neighborhood where so many people and kids live,” said neighbor Dorell Green. “Different types of people come and go. You don’t know who is coming or leaving.”

Ivette Santana, another resident, said her primary concern is the violence. “I don’t care about the Airbnb,” Santana said. “My problem is the shooting over there.”

Blount is being held without bond at the Broward County Jail.

Advertisement

CBS News Miami has contacted Airbnb to determine if the property remains in operation. We are also working to contact the property’s owners.



Source link

Advertisement
Continue Reading

North Carolina

Sickness causing explosive diarrhea reportedly reaches 145 cases in North Carolina

Published

on

Sickness causing explosive diarrhea reportedly reaches 145 cases in North Carolina


The video above is a live stream of WBTV and affiliated programming, and may not be directly related to the article below.

CHARLOTTE, N.C. (WBTV) – A sickness causing explosive diarrhea across the United States has been reported in North Carolina.

State health officials confirmed on Tuesday, July 7, that at least 145 cases of cyclosporiasis had been reported in North Carolina since May 1.

According to the state’s health website, cyclosporiasis is an intestinal illness caused by a parasite known as cyclospora. Sickness is often brought on by consuming food or water that is contaminated with the parasite.

Advertisement

The state’s website says it usually takes a week for symptoms to show up after consuming the contaminated food or water.

Among the symptoms are:

  • Watery diarrhea with frequent, sometimes explosive bowel movements
  • Loss of appetite
  • Weight loss
  • Stomach cramps/pain
  • Bloating
  • Increased gas
  • Nausea
  • Fatigue

Health officials said cyclospora is often associated with fresh herbs and produce that are served uncooked. They said because those items often go uncooked, it is imperative for them to be cleaned prior to eating.

According to the CDC, healthy people who contract cyclosporiasis usually recover without treatment but may have symptoms for a few days to a month or longer. In other cases, the sickness can be treated with antibiotics.

As of mid-June, the CDC reported cyclosporiasis cases in 17 states. At that point, no deaths had been reported.

FILE PHOTO — A sickness that can cause explosive diarrhea has made its way to North Carolina.(MGN)

Also Read: One US state is now reporting 700+ cases of ‘explosive’ diarrhea linked to parasite

Advertisement

Copyright 2026 WBTV. All rights reserved.



Source link

Continue Reading

North Carolina

Manns Harbor Bridge repairs to be ‘most complete’ in decades | Coastal Review

Published

on

Manns Harbor Bridge repairs to be ‘most complete’ in decades | Coastal Review


Diver Roman Morgan applies quick-setting mortar by hand, the final step in this method of repairing damaged bridge pilings. Photo: Kip Tabb

As the Manns Harbor Bridge over the Croatan Sound nears its 70th birthday, it’s getting what North Carolina Department of Transportation Resident Engineer Pablo Hernandez recently called “the first major renovation that I’m aware of in my 28-, almost 29-year career here in Dare County.”

The bridge, he added quickly, needs work, but overall, “the fact is that we got almost 70 years out of it without a tremendous amount of maintenance investing.”

Hernandez also added that the work that had been done, mainly minor concrete repairs and a paint job about every 25 to 30 years, “but the current project seems to be the most complete.”

When the William B. Umstead Bridge, as it is officially known, opened to traffic in December 1956, Outer Banks newspaper the Coastland Times described it as “a fine Christmas present for the Southern Albemarle region,” adding that it “will make possible a lot of holiday visiting, particularly on the Dare County mainland.”

Advertisement
North Carolina Department of Transportation Resident Engineer Pablo Hernandez takes Coastal Review under the bridge. Photo: Kip Tabb
North Carolina Department of Transportation Resident Engineer Pablo Hernandez takes Coastal Review under the bridge. Photo: Kip Tabb

The bridge connects mainland Dare County with Roanoke Island and the Outer Banks. This delivered 20th century amenities to the isolated hamlets and towns of mainland Dare County that had yet to be electrified. With the bridge carrying connections for electric power and telephones, “some eight families will have electric lights for the first time” in the sleepy fishing village of Mashoes. And in the longstanding, unincorporated Manns Harbor community, “the bridge makes possible modern telephone,” the Coastland Times reported.

Although the bridge may appear to be in surprisingly good shape, it is a solid 40 years beyond its expected lifespan, and when the $33.75 million project began in summer 2023, uncertainty remained about the extent of repairs needed.

The original price tag has risen: “Estimated projections of total costs are currently around $45 million,” Hernandez wrote in an email. “We are doing what we can to control the costs but not to the detriment of the structure.”

“Until you’re there, you don’t know what you’re going to find, just like with an old house,” Hernandez said, “you start renovating it, and things need attention.”

The project is a blend of modern materials and traditional, often hands-on applications. Resurfacing the deck, for example, was completed using an epoxy that included an aggregate material to provide a textured surface. During the application process, the bridge was closed for nine months.

This aerial view of the Umstead Bridge over Croatan Sound and connecting Manns Harbor and Roanoke Island was made by photographer Charles Brantley
This aerial view of the Umstead Bridge over Croatan Sound and connecting Manns Harbor and Roanoke Island was made by photographer Charles Brantley “Aycock” Brown in 1957. Source: State Archives of North Carolina

“All of those layers of the epoxy, as well as the aggregate to provide the textured surface, were all applied by hand, so over 300,000 square feet of bridge deck was rolled and squeegeed with these four separate layers of epoxy,” Hernandez explained.

The decision to apply the new surface in this way, instead of using “specialty trucks and pavers,” was in part because of the bridge’s 70-year-old design and the weight of the materials. “We don’t put a lot of what we call dead load on the bridge,” said Hernandez.

Advertisement

Other factors were also considered. “The deck was in surprisingly solid, good condition,” Hernandez said, “so there was no need to remove an inch just to put back another inch.”

The epoxy used is a viscous material that seals any cracks that may have developed.

Hernandez said the bridge design has a “certain robustness to begin with. It’s kind of like building a a deck on your house when you use a six-by-six post or an eight-by-eight or four-by-four post.”

Home to purple martins, pre-dedication damage

The bridge has for years been home to thousands of purple martins during summer. Hernandez, in response to Coastal Review’s query, was emphatic that the birds’ droppings had not damaged the bridge. He pointed out that the aerobatic birds roost on the bridges steel beams and atop the caps, concrete members that support the steel beams and are only there at night.

“From my experience, we have not seen a tremendous amount of bird droppings,” he said. Hernandez cited as evidence one night when he was with the Purple Martin Society conducting bird surveys. “We provided a boat and there were hundreds of thousands flying around. I don’t think anybody got nailed (with droppings).”

Advertisement
A piling was removed from this part of the structure after a grain barge rammed the bridge in March 1957. Photo: Kip Tabb
A piling was removed from this part of the structure after a grain barge rammed the bridge in March 1957. Photo: Kip Tabb

The most recent work has been below the bridge deck and the view down there is concerning. On the north side of the bridge, toward the mainland side, an entire piling is missing. In its place, iron girders support this part of the bridge. A March 1957 storm took out the piling before the bridge was officially dedicated the following month.

A grain barge, the C. W. Curlett “struck the bridge when it got out of control, said to have been due to the failure of one of the two motors. It swung down and struck the North side of bridge, shattering one of the huge concrete piles, so that the reinforcing steel inside it was exposed and bent,” the Coastland Times reported.

Just to the east of the bridge’s center rise, workers have been lowered to assess its condition. One worker taps the concrete with a hammer while another makes notes of their observations.

“They are listening for a hollow or dull sound,” Hernandez explained. “This indicates a deteriorated concrete layer.  If it is solid, it will have a distinct sharp, pinging sound.”

Repairs to the concrete pilings are now the project’s focus. The concrete is showing its age, largely because of the limited materials available in 1956, as compared to current designs. The bridge pilings, Hernandez said, were only “mildly” reinforced. “It just has reinforcing bars in it.”

Kevin Brown and Adam Conner with the bridge crew evaluate a piling for spalled and deteriorated concrete. Photo: Kip Tabb
Kevin Brown and Adam Conner with the bridge crew evaluate a piling for spalled and deteriorated concrete. Photo: Kip Tabb

The reinforcing bars, or rebar, is exposed through cracks in the concrete. Repairs involve removing any rust from the iron and replacing the concrete. Although there is visible rust on the rebar, the one-inch bars are still in good shape with only basic maintenance needed to clean the rust and repack the concrete.

Hernandez compared the Manns Harbor Bridge pilings to those supporting the nearby new Lindsay C. Warren Bridge, aka the Alligator River Bridge, a project to replace the early 1960s-era structure that Hernandez also supervises. The pilings there are prestressed, by “basically taking a very dense and durable cable and stretching it, pouring concrete around it, and then letting that elastic force come back in (and) help squeeze the concrete together, so you get a denser piling that can go through a lot more cycles without any kind of cracking.”

Advertisement

Looking back: State awards $450M deal to build new Alligator River bridge

The cracks in the Umstead Bridge were not unexpected after seven decades. Temperature variations and cycles of freezing and thawing in a marine environment will cause the material to develop small fissures. Once air reaches the rebar, the iron begins to rust. Conversely, below the surface of the water, in what is considered anaerobic conditions, “the concrete is dense and sound, and the rebar is protected from water and oxygen,” Hernandez replied in an follow-up email. “The majority of the deterioration of the concrete and rebar is in the splash zone where there his ample oxygen to facilitate the corrosion process of ferrous metals.”

Repacking the piling concrete is one of the most labor-intensive, hands-on parts of the project. After removing the damaged concrete and cleaning the rebar of rust, barges form a protected area around the work zone under the bridge. On a barge deck, workers mix Speed Crete Blue Line, a product described by Hernandez as a “rapid-setting underwater concrete repair mortar.” According the manufacturer, Euclid Chemical, the product will set in three to five minutes after coming in contact with water.  

Three divers are also employed in the repairs, reaching into buckets of mortar, pulling out a handful and pushing it into the voids and continuing the process until the piling is back to its original specs.

The mortar creates an airtight seal, protecting the rebar inside the piling. Then the pilings get an additional layer of protection.

Advertisement

“After we do the concrete piling, we come back with an epoxy-saturated carbon-fiber sheet of fabric and wrap that around the piling shell,” Hernandez said.

The bridge is considered one of the state’s “high-value bridges,” Hernandez said, referring to bridges within a $50 to $70 million range replacement cost.

Hernandez noted an NCDOT assessment of the bridge that asked, “Could we invest in a significant bridge preservation effort to get another 20, 30 or 40 years of life out of those structures?”

The repairs, Hernandez said, are going well, but the work originally slated for a Nov. 26 completion date that is “around the corner,” is unlikely to wrap up as scheduled. “Unfortunately we’re not going to be complete with the concrete repairs.”



Source link

Advertisement
Continue Reading
Advertisement

Trending